Apr12

WCR's Trail Work Day, this Saturday, April 14th

WCR's Trail Work Day, this Saturday, April 14th

Whiskey Creek Racing is having a Trail work and clean up day this Saturday, April 14th. Come give a hand in making the Whiskey Creek riding area as good as it possibly can be for the upcoming Roots of Doom race and for the rest of the year. If you ride these trails and love the area for riding, please come show you support and give a hand for a few hours.
Tools that may be needed are: Rake, saw, axe, pick axe etc.

The race loop is already set and arrowed. So let's cut out some of those nasty roots, overhanging branches and/or dead fall, those pesky marble rocks that catch your front tire every so often, and maybe fill in some ruts and trenches. Whatever we can do to make Whiskey ready to race!

See you there this Saturday!

Here are poster for the work day, Roots of Doom race, the 2012 BCORCS, and the 2012 VIHSS.

web design & hosting by Trevor May of CKA.